Back side of the house while standing in the east.

The patio will go up next to the house there where all that scaffolding is standing.

Scroll down...

Patio site is all covered with building materials.

Because the ceilings inside are 12 foot they needed scaffolding everywhere.

On the right is the master bedroom. First are the two small windows of the master bath, then the two larger windows.  I thought of someday perhaps putting a balcony up there off the master bedroom with a door leading out between those two windows (all the way on the right, upper level)

Scroll down...

Here is the edge of the patio site.

Please pardon the construction clutter. Those workmen aren't very neat with the white plastic!

Index of Photos | Next Photo


Main Info

House
Floorplans
Front
Garage
Back
Another Back
More Back

Grounds
Spring
Forest
Ledge
Streambed
Pond
View East
View North
View South
The Area
Tahlequah
Illinois River
Lake Tenkiller
Call the Realtor